Plug. And play.
mastermoves MoCo systems are set up on the set in no time – thanks to the astonishingly simple rig design and the sophisticated technology such as laser-supported rail levelling. Most times the system is ready to roll at most 90 minutes after the mastermoves team's arrival. Detailed planning such as 3D previsualisation of runs created in advance ensures maximum efficiency and production reliability on the set.